Labyrinth Resources (ASX:LRL) have provided an operational update today for shareholders.
Key pieces of information:
– 2,000m of drilling completed to date
– Initial 8 holes have all intersected the Boucher structure
– Visible Gold intersected outside current non-JORC resources between Talus and Boucher lodes (highlighting potential to expand known mineralisation)
– Acquisition of 7 new Mining claims in adjacent Ontario
– Compilation of maiden JORC resource on track for delivery in 2022 (existing NI43-101 foreign estimate is 2.1Mt at 7.1g/t for 479,000oz)
In 2003, Dean Pittaway was run over by an Underground Truck and could not have been any closer to dying. He has a both...
Gain access to all uncensored and Mine School content here ► https://patron.podbean.com/lifeofminepodcast Eric Cowan is a legendary Airleg Miner that has had an extensive...
***1.16% Lithium = 11.6g/t Gold** – Essential Metals takeover analysis Welcome to today’s episode of Channel Mine News, the go-to “in your ears” Mining...